Get the detail right in packaging automation
Working with best‑in‑class machinery manufacturers over the years has built up extensive knowledge and know‑how when it comes to implementing an automation project. However, managing and delivering successful automated packaging lines from start to finish requires immense planning and a deep understanding of what needs to be achieved.
Building the right project team for automation
From the outset, a strong, technically minded sales team is needed to scope out exactly what automated packaging lines demands. The specification phase needs to be rigorous, with a clear understanding of the customer’s packaging requirements and the ability to match the right equipment to the application.
Does the customer need a fully automated packaging option? It is about selecting the best individual machines to create the most efficient packaging line. Concept and feasibility are critical to automation and getting the project off the ground.
Whether it is a single machine or a complete line, early involvement from all key stakeholders is vital when drawing up the packaging automation brief. From the outset, it is important to clearly define your core team: project manager, engineering leads, controls and automation, procurement, operations, health and safety, maintenance and quality.
Site surveys, material checks and technical verification phases all need to be robust. The most successful projects bring together a wealth of technical knowledge, ensuring customers fully understand what they need and why particular equipment has been selected for the project.
Process mapping for automated packaging lines
Process mapping is perhaps an underrated tool in the success of an automated packaging line project, but it delivers real benefits. When done correctly, it clarifies process flow, reveals bottlenecks, highlights unclear decision points, and reduces downtime during commissioning. It also ensures customers fully understand the project’s expectations.
FAT & SAT testing in packaging automation projects
The Factory Acceptance Test (FAT) is a crucial quality‑assurance process. It involves testing equipment at our manufacturing sites before shipment to ensure the machinery meets design specifications, functional requirements and safety standards. The FAT stage minimises risk by identifying any snags or remedial works early, saving both time and cost.
Once delivered, the packaging line undergoes electrical and mechanical installation, followed by a dry test phase. This is then followed by a wet test, typically using water, before commissioning with the final product.
After this follows a controlled ramp‑up of the line speed. The final stage is the Site Acceptance Test (SAT), which typically lasts around four hours, ensuring that all agreed targets are met. This marks the end of the project and the start of the handover phase.
The KTC automated packaging success story
Autopack worked on a turnkey project with edible oils manufacturer KTC, drawing on its reputation for collaborating with world‑class manufacturing partners. The project highlights Autopack’s capability in tackling challenging automated packaging applications and delivering complete project management solutions for clients.
The original brief was to fill two bottle formats (0.5 litre and 1 litre) at 120 bottles per minute. This later expanded to sourcing best‑in‑class automated equipment for the entire line, delivering an immediate uplift in speed and efficiency.
Bottles were automatically formed and fed onto the filling line. In addition, the end of line was automated, with boxes formed, packed and sealed. The technological upgrade continued with the introduction of a fully automated palletising and wrapping system.
One of the main challenges was designing the packaging line within the available space. This required optimising the equipment layout and making the most of both floor space and height. The Autopack team carried out multiple site visits to ensure the correct fit of the automated packaging line.
The project demonstrated Autopack’s expertise in taking complex production challenges and turn them into high‑performance, fully integrated lines that deliver real, measurable change.
To watch the video on the KTC video go to https://www.youtube.com/watch?v=EHyyJ5N2rm0
Key takeaways to a successful automated packaging capital project
- Have a strong sales team clearly defining the scope
- Technical project managers to manage the project to completion
- Maintain a clear handover process to the after‑sales team once the project is complete
- Communicate consistently – packaging automation projects often become delayed when teams are not fully aligned
Delivering packaging automation success
At Autopack, we support customers at every stage of a capital project, from early concept and specification through to commissioning and after sales support. By combining technical expertise, disciplined project management and close collaboration with trusted partners, we help manufacturers reduce risk, improve efficiency and deliver automated packaging lines that perform reliably in real production environments. The result is a smoother transition to automation and a capital investment that delivers measurable, long-term value.
Find out more about how our after-sales support can assist your packaging manufacturing needs.
Frequently asked questions: packaging automation projects
What makes a packaging automation project successful?
A successful packaging automation project starts with a clear specification, early stakeholder involvement and robust project management from concept through to commissioning. Success depends on selecting the right automated equipment for the application, validating performance through FAT and SAT testing, and maintaining clear communication between engineering, operations and suppliers throughout the process.
When should a business invest in packaging automation?
Businesses typically invest in packaging automation when demand increases, labour availability becomes challenging, or consistency, speed and efficiency are critical to maintaining competitiveness. Capital investment in automated packaging is often driven by the need to reduce operating costs, improve quality control and create scalable production capacity for future growth.
What is a Factory Acceptance Test (FAT) in packaging automation?
A Factory Acceptance Test (FAT) is a formal testing stage carried out before automated packaging equipment leaves the supplier’s site. During a FAT, machinery is tested against agreed performance, functional and safety criteria to reduce risk, identify issues early and ensure the system is ready for installation. FATs play a key role in delivering packaging automation projects on time and on budget.
What is the difference between FAT and SAT?
FAT (Factory Acceptance Test) takes place before equipment is shipped, while SAT (Site Acceptance Test) is carried out after installation at the customer’s facility. SAT confirms that the automated packaging line performs as expected in the real production environment and meets agreed throughput, quality and safety targets before final handover.
Why is process mapping important in automated packaging projects?
Process mapping helps define process flow, identify bottlenecks and clarify decision points across an automated packaging line. By mapping processes early in the project, businesses can reduce commissioning time, minimise downtime and ensure all stakeholders have a shared understanding of how the packaging automation system will operate.
How long does an automated packaging project typically take?
The timeline for an automated packaging capital project depends on complexity, customisation and supplier lead times. Projects can range from several weeks for standalone systems to longer programmes for fully integrated, multi-line automation. Early planning, detailed specifications and proactive supplier coordination help keep projects on schedule.
What role does after‑sales support play in packaging automation success?
After-sales support is critical to the long-term success of packaging automation. Ongoing service, maintenance and technical support help minimise equipment downtime, protect the original capital investment and ensure the automated packaging line continues to deliver performance improvements throughout its lifecycle.